- Client
- Conveyor manufacturer
- Years
- 2006 to 2012
- Scale
- ≈ 160,000 lines of C#, about 20 AutoCAD commands
Before
Every quote needed a layout drawing, a parts list, a horsepower calculation, a cost and a Word document, all done by hand. It took days, and won orders were re-entered for production, with errors along the way.
What we built
- Parametric conveyors and components, added from a property palette
- Drive horsepower and belt pull calculated while designing
- Bill of materials inserted in the drawing or exported to Excel
- Quoting application: pricing, margins, contracts and Word quotes generated from templates
Results
- Quotes in hours instead of days
- Accepted quotes sent straight to production, with no re-entry
- No errors between the quote and the sale
Technologies
- AutoCAD 2011–2012
- AutoCAD .NET API
- C#
- WinForms
- DevExpress
- SQL Server
- NHibernate
- ASP.NET web services
- Word
- Excel
Does your team redraw the same things every week?
Let’s talk about what AutoCAD could do for them.